PROJECTS

  • 2020

    Khafji Joint Operations

    Installation of HM40 BU balancing machines extension.

  • 2020

    AMMROC

    Relocation of critical workshop equipment from abu dhabi to al ain

    2020

  • 2020

    ASAS AL-JOOD

    Installation of HM 40U/Bu balancing machine

  • 2019 – 2021

    Sabic – Kemya

    Steam Trap Survey

    2019 – 2021

  • 2019

    Sahara - Samapco

    Steam Trap Survey

  • 2019

    Ma’adeen

    Gear Box & Vacuum Pump Overhauling

    2019

  • 2019

    Sabic – Petrokemya

    Steam Trap Survey

  • 2019

    Sahara - Al Waha

    Steam Trap Survey

    2019

  • 2019

    Sipchem - IGC

    Steam Trap Survey

  • 2019

    Mitsubishi Heavy Industries

    Relocation of workshop equipment

    2019

  • 2019

    Sipchem – IUC

    Steam Trap Survey

  • 2019

    Elliott Ebara

    Installation of complete workshop machines

    2019

  • 2019

    ARAMCO NGL YANBU

    Installation of PASIO 50SC balancing machine

  • 2019

    ARAMCO RAS TANURA

    Installation of HM30 BU balancing machine.

    2019

  • 2019

    EBARA pumps Saudi Arabia

    Installation of HM20BU balancing machine

  • 2019

    ARAMCO SHEDGUM

    Installation of PASIO 50SC balancing machine

    2019

  • 2018 – 2019

    Sabic – Ibn Zahr

    Steam Trap Survey

  • 2018

    DP world Dubai

    Installation of HM40BU balancing machine.

    2018

  • 2018

    Sherbiny Pumps

    Fabrication of Pump Skid

  • 2018

    Ma’adeen

    Repair of Hydraluic Cylinder

    2018

  • 2018

    Sahara Petrochemicals

    SS316L Impeller Casting and balancing as per given Sample

  • 2018

    HEISCO KUWAIT

    Installation of HM40U balancing machine.

    2018

  • 2018

    Seimens Energy hub

    Installation of 3 balancing machine of various capacity

  • 2018

    JOHN CRANE SAUDI

    Installation of HM3BU balancing machine.

    2018

  • 2018

    JOHN CRANE SAUDI

    Installation of HM4BU balancing machine.

  • 2018

    Sherbiny Pumps

    Fabrication of Pump Test Bench

    2018

  • 2018

    Ebara Pumps

    Installation and commissioning of HM50 U

  • 2018

    ELLIOT EBARA GAS SERVICES DAMMAM

    Installation of HM 60U/BU & HM50BU, & HM 30BU balancing machines

    2018

  • 2017 – 2018

    ITT Gould

    Steam Trap Survey

  • 2017

    KOC KUWAIT AHMADI

    Installation of VIRIO 300 balancing machine.

    2017

  • 2017

    Mitsubishi industries

    Installation of H9V 100 ton capacity machine

  • 2017

    ITT Gould

    Low Flow Test Loop System Fabrication & Installation

    2017

  • 2017

    SABIC – Petrokemya

    Steam Drum Retrofit

  • 2017

    Hitec Engineering

    Installation of Hm 60 U/BU

    2017

  • 2017

    SPX FLOW SAUDI ARABIA

    Installation of HM40U balancing machine.

  • 2016

    DUBAI MUNICIPALITY

    Installation of HM4BU balancing machine.

    2016

  • 2016

    SWCC

    Replacement of Fuel Gas Line for Phase 2B Boilers

  • 2016

    SADARA JUBAIL

    Installation of HM 60U/BU & HM 30BU balancing machines

    2016

  • 2016

    SABIC - Petrokemya

    Fabrication & Supply of Column & Reboilers

  • 2016

    Luberef 1

    Shutdown | Column Maintenance & Cleaning

    2016

  • 2016

    SABIC - Petrokemya

    BFW Injection to CGC Casing

  • 2016

    SABIC-SADAF JUBAIL

    Installation of PASIO 15 balancing machine.

    2016

  • 2016

    Atlas Copco Dubai

    Relocation of balancing machine Hm 4/20 BU-TL

  • 2015

    KOC KUWAIT AHMADI

    Installation of Hm7 U/BU Machine

    2015

  • 2015

    Sahara Petrochemicals

    Design Modification & Fabrication of 38” Reactor Elbow 90 deg w/o Straightening Vanes

  • 2014

    RAS GAS

    Installation of Hm 60 U/BU in Al barzan plant

    2014

  • 2014

    Emirates engine maintenance centre

    Installation of 5 balancing machines

  • 2014

    Sahara Petrochemicals

    32” Flange Machining, Precise Machining & welding with very low allowable tolerance

    2014

  • 2014

    GASCO RUWAIS and Habshan

    Training of the personnel on basics of Balancing

  • 2013

    Petro Rabigh

    Refurbishment of the HM 60 Bu balancing machine

    2013

  • 2013

    SAUDI Aerospace Engineering Industries

    Installation of the HL5 Aero balancing machine

  • 2013

    SABIC – Ibn Sina

    Replacement of separation internals in two vessels during shut down

    2013

  • 2013

    Basic Chemical Industry

    Piping Installation Project

  • 2012

    Saudi Aramco MSSD Dhahran

    Installation of HM60 U/BU 20 Ton capacity balancing machine

    2012

  • 2012

    Smart Industrial trading Est.

    Supply of dual channel vibration monitoring unit

  • 2012

    ORPIC

    Commissioning and training for Hm 60 BU

    2012

  • 2012

    GASCO RUWAIS

    Installation of Hm40U/BU Balancing machine and also other workshop equipment

  • 2012

    GE Middle east

    Refurbishment of the Mobile tool post for huge machining activities

    2012

  • 2012

    BAPCO

    Insatallation and commissioning of Hm30 BU

  • 2012

    Saudi Chevron

    Installation of Hm 50 Bu balancing machine

    2012

  • 2011

    GE Middle east

    Relocation of H8v -40 ton balancing machine

  • 2011

    GE POWER

    Fabrication of SS heat shield for motors for rabigh power plant

    2011